To Carefully Check The Oil Pressure from 's blog
The post operators must obey the marked operation procedures specified in mill's start-up and shutdown procedures.
Before starting, it is necessary to carefully check whether there is ore or foreign matter in the crushing chamber; Before start-up in winter, use electric heater to heat the oil to 15 ℃ before start-up, and the oil level is between the upper and lower limits;
Start the oil pump, wait until the oil pressure is stable at 0.07-0.13mpa, and the lubricating oil in the oil return pipeline returns to the oil tank, then start ultrafine vertical mill, and start feeding after no-load operation for 10min.
Post
Rate
Archives
- All
- January 2023
- November 2022
- September 2022
- August 2022
- July 2022
- May 2022
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- April 2020
- March 2020
- January 2020
- December 2019
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- July 2018
- June 2018
- May 2018
- April 2018
The Wall