Maintenance Method of Jaw Crusher from 's blog
1) Before starting the equipment, the operator should carry out a comprehensive inspection of the equipment, including bolt tightening in all parts, reducer oil level and bearing lubrication.
2) Jaw crusher should start without load, and only when it reaches normal speed and has no abnormal condition can it start feeding. The feeding should be stopped before normal shutdown, and only after the material in the crushing chamber is discharged can the shutdown be stopped, except in special cases. No start-up with load is allowed.
3) After long-term shutdown or before the initial start-up, the jaw crusher should be thoroughly checked to see whether the bolts are loose, whether enough lubricating oil is injected into the reducer, whether lubricating grease is added to the bearings, whether the wiring of the electrical circuit and the control switch is correct, whether the wiring is loose or not, and whether the material in the crushing chamber has been cleared. After confirming the correctness, start the jaw crusher and observe whether the direction of the jaw crusher is correct, then the jaw crusher can be officially started.
Post
Rate
Archives
- All
- January 2023
- November 2022
- September 2022
- August 2022
- July 2022
- May 2022
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- April 2020
- March 2020
- January 2020
- December 2019
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- July 2018
- June 2018
- May 2018
- April 2018
The Wall